Context

Issue #6148 activated a 90-day retention runner whose four hourly 10,000-row batches retire up to 960,000 rows/day. The issue judged that margin thin by comparing it against intake — 641,713 new events/day when written, 591,244 when measured — and concluded the backlog and the deletion contract "require production measurement rather than assumption." The comparison was against the wrong denominator, which made a comfortable 8-day drain look marginal.

Guidance

A retention job that deletes rows older than N days does not race intake. It races the rate at which rows cross the N-day boundary — which is the traffic the system took N days ago, not today's.

Measure it directly rather than deriving it:

sql
-- rows that will become eligible in the next 24h
SELECT count(*) FROM website_event
WHERE created_at >= now() - interval '91 days'
  AND created_at <  now() - interval '90 days';

For #6148 that returned 134,653/day against 591,244/day of intake — a 4.4x difference, because the boundary was still sweeping through much quieter traffic from three months earlier (daily volumes either side of the cutoff ran 71k–204k).

Both numbers matter, for different questions:

QuestionDenominator
How long to clear the existing backlog?eligibility rate (traffic N days ago)
Does the schedule hold once caught up?intake (today's traffic)
  • Drain: backlog / (capacity - eligibility) → 6,924,840 / (960,000 - 134,653) ≈ 8.4 days
  • Steady state: capacity / intake → 960,000 / 591,244 ≈ 1.62x margin

Sizing on eligibility alone under-provisions a growing system: as the boundary walks forward it eventually reaches present-day volume and eligibility converges on intake. Sizing on intake alone over-states the backlog drain and can argue a healthy schedule into looking inadequate.

Why This Matters

The two denominators diverge exactly when it is most tempting to guess: on a system whose traffic has grown. The gap is the growth ratio over the retention window, so a fast-growing service can show intake several times eligibility — and a reviewer comparing capacity to intake will read a comfortable margin as a knife-edge, or (in the opposite direction, on a shrinking system) approve a schedule that never catches up.

A related trap: an eligibility rate sampled over a short window is not the daily average, because it inherits the hour-of-day shape of traffic N days ago. During #6148's evening observation the observed inflow was ~800/tick (≈79k/day) against a measured daily figure of 134,653 — the short sample would have overstated the drain rate by 40%. Use a full 24-hour band for the number you publish; use short samples only to sanity-check direction.

When to Apply

Any bounded delete-by-age job: analytics retention, log/audit TTL, soft-delete reaping, archival sweeps, GDPR erasure batches. The rule generalizes past rows — anything with an age-triggered queue (files, blobs, partitions) has the same two denominators.

Examples

Capacity claims should be stated against both, and the eligibility figure should be a measurement, not an inference:

Weak — one denominator, unmeasured:

Four bounded 10,000-row batches per hour can retire up to 960,000 event rows per day, safely above the roughly 300,000 events/day observed before #6024.

Strong — both denominators, both measured:

Measured deletion throughput: 10,000 rows/tick x 4 ticks/h = 960,000/day, confirmed from every tick's log. Rows become eligible at 134,653/day (measured over the 90–91 day band), so the 6.89M backlog clears in ~8.3 days. Steady state is governed by intake at 591,244/day, leaving a 1.62x margin.

The measured-throughput half matters too: 960,000/day is a ceiling that assumes every tick really reaches its cap. Confirm it from the job's own output (DELETE 10000 on each statement, each tick) before treating it as capacity. See the runner's activation record for the schedule this rule sized.