rfd/0187-redesign-enroll-new-resource-page.md
This project aims to be scoped to be feasible for one full-stack engineer with support from design and product input, aiming for a completion timeline of approximately 6 weeks.
By providing an improved experience for picking options on the Enroll a Resource page, users will be able to find relevant guides more easily, and new users in particular will be better equipped to determine if Teleport is a good solution for their needs. An improved enrollment process will improve PoV and trial success rates.
We could go really granular on filters, which would require creating and maintaining more identifiers on each resource panel. We should minimize the filter list, maybe by mirroring the current dashboard view options. Doing a guided questionnaire came up during brainstorming. How/where/when to access that and how long/complex it would be could blow out scope. If scope needs to be cut, it could be cut there.
This project does not intend to overhaul existing resource-specific documentation or setup guides but aims to streamline how users access and begin these guides. There are issues with individual guides that contribute to PoV/trial failure, but enhancements to setup guides fall under other RFDs.
The FigJam board has original notes.
We know that the shorter a PoV process the higher our win rate. Improving the resource enrollment flow with a focus on helping new users get to the right guides (whether that is a test of a quick setup or of a scale solution) will hopefully lead to higher conversion rates for PoVs and trials.
Some notes:
To be added to by engineering team.