Back to Source Monitor

PLAN-04 Summary: fix-log-entry-and-autoloading

.vbw-planning/milestones/03-coverage-analysis-quick-wins-critical-path-test-co/phases/03-large-file-refactoring/PLAN-04-SUMMARY.md

0.15.02.5 KB
Original Source

PLAN-04 Summary: fix-log-entry-and-autoloading

Status: COMPLETE

Commits

  • Hash: fb99d3d
  • Message: refactor(plan-04): fix LogEntry table name and replace eager requires with autoloading
  • Files changed: 2 files, 125 insertions, 60 deletions

Tasks Completed

Task 1: Fix LogEntry hard-coded table name

  • Removed self.table_name = "sourcemon_log_entries" from log_entry.rb
  • Model now relies on ModelExtensions.register(self, :log_entry) for dynamic table name
  • Table name resolves correctly via configurable prefix system
  • LogEntry tests: 1 run, 4 assertions, 0 failures

Task 2: Replace eager requires with autoload declarations

  • Replaced 66 eager require statements with 71 autoload declarations
  • Kept 11 explicit requires for boot-critical modules: version, engine, configuration, model_extensions, events, instrumentation, metrics, health, realtime, feedjira_extensions
  • Organized autoloads by domain module: Analytics, Dashboard, Fetching, ImportSessions, Items, Jobs, Logs, Models, Pagination, Release, Scrapers, Scraping, Security, Setup, Sources, TurboStreams
  • Full suite: 760 runs, 0 failures, 0 errors

Task 3: Verify full integration and RuboCop

  • All 760 tests pass with autoloading (no load-order issues)
  • RuboCop: 2 files inspected, 0 offenses
  • REQ-11 and REQ-12 satisfied

Deviations

IDDescriptionImpact
D-0171 autoload declarations instead of planned 40+ minimumPositive -- more thorough conversion covering all lib modules

Verification Results

CheckResult
grep 'self.table_name' log_entry.rbNo matches (removed)
grep 'ModelExtensions.register' log_entry.rbPresent on line 17
grep -c '^require ' lib/source_monitor.rb11 (target: <15, down from 66)
grep -c 'autoload' lib/source_monitor.rb71 (target: 40+)
bin/rails test760 runs, 2626 assertions, 0 failures, 0 errors
bin/rubocop lib/source_monitor.rb app/models/source_monitor/log_entry.rb2 files inspected, 0 offenses

Success Criteria

  • LogEntry no longer has hard-coded table name
  • LogEntry uses ModelExtensions.register for dynamic table name
  • Eager require count reduced from 66 to 11 (target: <15)
  • 71 autoload declarations replace the eager requires (target: 40+)
  • All existing tests pass without modification
  • Full test suite passes (760 runs, 0 failures)
  • RuboCop passes on modified files
  • REQ-11 and REQ-12 satisfied