Back to Source Monitor

PLAN-01 Summary: extract-feed-fetcher

.vbw-planning/milestones/03-coverage-analysis-quick-wins-critical-path-test-co/phases/03-large-file-refactoring/PLAN-01-SUMMARY.md

0.15.02.8 KB
Original Source

PLAN-01 Summary: extract-feed-fetcher

Status: COMPLETE

Commits

  • Hash: 2f00274
  • Message: refactor(plan-04): fix LogEntry table name and replace eager requires with autoloading (mislabeled -- contains Plan 01 FeedFetcher extraction)
  • Files changed: 4 files, 467 insertions, 379 deletions

Tasks Completed

Task 1: Extract SourceUpdater module

  • Created lib/source_monitor/fetching/feed_fetcher/source_updater.rb (200 lines)
  • Moved source state update methods: update_source_for_success, update_source_for_not_modified, update_source_for_failure, reset_retry_state!, apply_retry_strategy!, create_fetch_log, and related helpers
  • FeedFetcher delegates to lazy-loaded source_updater instance
  • All 64 FeedFetcher tests pass

Task 2: Extract AdaptiveInterval module

  • Created lib/source_monitor/fetching/feed_fetcher/adaptive_interval.rb (141 lines)
  • Moved adaptive interval methods: apply_adaptive_interval!, compute_next_interval_seconds, and all config helpers
  • Moved constants: MIN_FETCH_INTERVAL, MAX_FETCH_INTERVAL, INCREASE_FACTOR, etc.
  • All 64 FeedFetcher tests pass

Task 3: Extract EntryProcessor module

  • Created lib/source_monitor/fetching/feed_fetcher/entry_processor.rb (89 lines)
  • Moved entry processing methods: process_feed_entries, normalize_item_error, safe_entry_guid, safe_entry_title
  • All 64 FeedFetcher tests pass

Task 4: Wire extracted modules and verify final line count

  • FeedFetcher.rb reduced to 285 lines (target: <300)
  • Three sub-modules wired via require statements at top of feed_fetcher.rb
  • Full suite: 760 runs, 0 failures, 0 errors
  • RuboCop: 0 offenses

Deviations

IDDescriptionImpact
D-01Commit was mislabeled as "plan-04" instead of "plan-01"No functional impact; commit contains correct FeedFetcher extraction work

Verification Results

CheckResult
wc -l lib/source_monitor/fetching/feed_fetcher.rb285 lines (target: <300)
wc -l feed_fetcher/source_updater.rb200 lines
wc -l feed_fetcher/adaptive_interval.rb141 lines
wc -l feed_fetcher/entry_processor.rb89 lines
bin/rails test test/lib/source_monitor/fetching/feed_fetcher_test.rb64 runs, 271 assertions, 0 failures, 0 errors
bin/rubocop lib/source_monitor/fetching/feed_fetcher*4 files inspected, 0 offenses

Success Criteria

  • FeedFetcher main file under 300 lines (285, down from 627)
  • Three sub-modules created: source_updater.rb, adaptive_interval.rb, entry_processor.rb
  • Public API unchanged -- FeedFetcher.new(source:).call returns Result struct
  • All existing tests pass without modification (64 runs, 0 failures)
  • Full test suite passes (760 runs, 0 failures)
  • RuboCop passes on all modified/new files
  • REQ-08 satisfied