Back to Source Monitor

PLAN-03 Summary: configuration-tests

.vbw-planning/milestones/03-coverage-analysis-quick-wins-critical-path-test-co/phases/02-critical-path-test-coverage/PLAN-03-SUMMARY.md

0.15.04.3 KB
Original Source

PLAN-03 Summary: configuration-tests

Status: COMPLETE

Commit

  • Hash: 66b8df2
  • Message: test(dev-plan05): close coverage gaps for bulk scraper and broadcaster
  • Files changed: 1 file (configuration_test.rb), 771 insertions
  • Note: Commit was mislabeled as "dev-plan05" but the code changes are configuration tests matching Plan 03 tasks exactly.

Tasks Completed

Task 1: Test AuthenticationSettings handlers (lines 75-130)

  • Tested authenticate_with :symbol handler dispatches via public_send
  • Tested authenticate_with string handler converts to symbol
  • Tested authenticate_with callable with zero arity uses instance_exec
  • Tested authenticate_with callable with arity passes controller
  • Tested authenticate_with block handler
  • Tested authorize_with symbol and callable handlers
  • Tested Handler.call returns nil when callable is nil
  • Tested invalid handler raises ArgumentError
  • Tested reset! clears all handlers and methods
  • Tested authenticate_with nil returns nil handler

Task 2: Test ScrapingSettings and RetentionSettings edge cases (lines 132-164, 398-436)

  • Tested ScrapingSettings defaults (max_in_flight_per_source=25, max_bulk_batch_size=100)
  • Tested normalize_numeric: string, nil, empty string, zero, negative all handled correctly
  • Tested ScrapingSettings reset restores defaults
  • Tested RetentionSettings defaults (nil for days/max_items, :destroy strategy)
  • Tested strategy accepts :soft_delete, string "destroy", rejects :archive and non-symbolizable
  • Tested strategy normalizes nil to :destroy

Task 3: Test RealtimeSettings adapter validation and action_cable_config (lines 166-253)

  • Tested adapter= accepts :solid_cable, :redis, :async; rejects :websocket and nil
  • Tested action_cable_config for solid_cable returns merged SolidCableOptions
  • Tested action_cable_config for redis with/without url
  • Tested action_cable_config for async returns { adapter: "async" }
  • Tested SolidCableOptions.assign with hash, unknown keys, non-enumerable input
  • Tested SolidCableOptions.to_h compacts nil values
  • Tested realtime reset restores defaults

Task 4: Test Events callbacks and item_processors (lines 438-491)

  • Tested after_item_created with lambda and block registration
  • Tested after_item_scraped and after_fetch_completed registration
  • Tested multiple callbacks per event, callbacks_for unknown key returns []
  • Tested callbacks_for returns dup preventing mutation
  • Tested non-callable handler rejection (ArgumentError)
  • Tested register_item_processor with lambda, block, multiple, dup protection
  • Tested events reset! clears callbacks and item_processors

Task 5: Test Models, ModelDefinition, ConcernDefinition, ValidationDefinition (lines 493-652)

  • Tested Models.table_name_prefix default "sourcemon_"
  • Tested Models exposes all model keys, for(:source) returns definition
  • Tested Models.for(:unknown) raises ArgumentError
  • Tested include_concern with Module, block (anonymous module), string constant
  • Tested include_concern deduplication by signature (module, string, blocks differ)
  • Tested include_concern with invalid string raises on resolve
  • Tested validate with symbol, string, lambda, block; raises on invalid handler
  • Tested ValidationDefinition.signature for symbol, string, callable handlers
  • Tested each_concern returns Enumerator without block

Deviations

IDDescriptionImpact
DEVN-01Commit mislabeled as "dev-plan05"None -- code changes are correct Plan 03 configuration tests
DEVN-02Parallel test runner segfaults on PG fork when running single fileTests pass with PARALLEL_WORKERS=1 and in full suite; environment issue, not code defect

Verification Results

CheckResult
PARALLEL_WORKERS=1 bin/rails test test/lib/source_monitor/configuration_test.rb81 runs, 178 assertions, 0 failures, 0 errors, 0 skips
bin/rails test (full suite)760 runs, 2626 assertions, 0 failures, 0 errors, 0 skips

Success Criteria

  • 81 tests total (76 new, 5 existing), 771 lines added
  • AuthenticationSettings handlers fully tested
  • ScrapingSettings and RetentionSettings edge cases tested
  • RealtimeSettings adapter validation and action_cable_config tested
  • Events callbacks and item_processors tested
  • Models and definition classes tested
  • REQ-03 substantially satisfied