Back to Source Monitor

configuration-tests

.vbw-planning/milestones/03-coverage-analysis-quick-wins-critical-path-test-co/phases/02-critical-path-test-coverage/PLAN-03.md

0.15.08.4 KB
Original Source

Plan 03: configuration-tests

Objective

Close the coverage gap in lib/source_monitor/configuration.rb (currently 94 uncovered lines out of 655). The existing test file has only 5 tests covering mission_control_dashboard_path, scraper registry, retention strategy default, and fetching settings. This plan targets the remaining uncovered branches across the 12 nested settings classes: AuthenticationSettings handlers, ScrapingSettings normalization, RealtimeSettings adapter validation and action_cable_config, RetentionSettings strategy validation, Events callbacks and item_processors, Models table_name_prefix and for method, ModelDefinition concerns and validations, ConcernDefinition resolution, and ValidationDefinition signatures.

Context

<context> @lib/source_monitor/configuration.rb -- 655 lines with ~12 nested classes @test/lib/source_monitor/configuration_test.rb -- existing test file with 5 tests @config/coverage_baseline.json -- lists 94 uncovered lines for configuration.rb @test/test_helper.rb -- resets configuration each test

Decomposition rationale: Configuration has many small nested classes, each with a few uncovered branches. Rather than one mega-task, we group by logical subsystem: (1) authentication handlers, (2) scraping/retention settings with edge cases, (3) realtime adapter validation, (4) events system, (5) models and concern/validation definitions.

Trade-offs considered:

  • Could create separate test files per settings class, but the existing pattern is one configuration_test.rb file.
  • Some branches (like ConcernDefinition with constant string resolution) require careful setup to test constantize calls.
  • RealtimeSettings action_cable_config branches test all three adapter paths.

What constrains the structure:

  • Each test must call SourceMonitor.reset_configuration! in setup/teardown (already present)
  • Tests should not leak state between settings classes
  • ModelDefinition tests need care around Module.new blocks </context>

Tasks

Task 1: Test AuthenticationSettings handlers

  • name: test-authentication-settings
  • files:
    • test/lib/source_monitor/configuration_test.rb
  • action: Add tests covering lines 75-130 (AuthenticationSettings and Handler). Specifically:
    1. Test authenticate_with(:some_method) creates a Handler with type :symbol that calls controller.public_send (lines 80-82)
    2. Test authenticate_with { |c| c.redirect_to "/" } creates a Handler with type :callable that calls the block with controller (lines 84-88) -- test both zero-arity and one-arity blocks
    3. Test authorize_with works the same way (line 105-107)
    4. Test that passing an invalid handler (not Symbol, String, or callable) raises ArgumentError (line 127)
    5. Test reset! clears all handlers and methods (lines 109-114)
    6. Test Handler.call returns nil when callable is nil (line 78) Use a mock controller object (OpenStruct with method stubs) to verify handler dispatch.
  • verify: bin/rails test test/lib/source_monitor/configuration_test.rb -n /authentication|authorize|handler/i exits 0
  • done: Lines 75-130 covered.

Task 2: Test ScrapingSettings and RetentionSettings edge cases

  • name: test-scraping-and-retention-settings
  • files:
    • test/lib/source_monitor/configuration_test.rb
  • action: Add tests covering lines 132-164 (ScrapingSettings) and lines 398-436 (RetentionSettings). Specifically:
    1. Test ScrapingSettings defaults (max_in_flight_per_source=25, max_bulk_batch_size=100)
    2. Test ScrapingSettings normalize_numeric: nil returns nil, "" returns nil, negative returns nil, positive returns integer (lines 157-163)
    3. Test ScrapingSettings setter with string input (e.g., "50") normalizes to integer
    4. Test RetentionSettings strategy= with nil defaults to :destroy (line 419)
    5. Test RetentionSettings strategy= with invalid value raises ArgumentError (line 430)
    6. Test RetentionSettings strategy= with string "soft_delete" normalizes to symbol
    7. Test RetentionSettings strategy= with non-symbolizable value raises ArgumentError (line 433)
  • verify: bin/rails test test/lib/source_monitor/configuration_test.rb -n /scraping_settings|retention_settings|normalize/i exits 0
  • done: Lines 132-164 and 398-436 covered.

Task 3: Test RealtimeSettings adapter validation and action_cable_config

  • name: test-realtime-settings
  • files:
    • test/lib/source_monitor/configuration_test.rb
  • action: Add tests covering lines 166-253 (RealtimeSettings, SolidCableOptions). Specifically:
    1. Test adapter= with :solid_cable, :redis, :async all accepted (line 178)
    2. Test adapter= with :invalid raises ArgumentError (line 179)
    3. Test action_cable_config for :solid_cable returns hash with adapter: "solid_cable" and SolidCableOptions merged (lines 197-198)
    4. Test action_cable_config for :redis returns hash with adapter: "redis" and redis_url when set (lines 200-202)
    5. Test action_cable_config for :async returns { adapter: "async" } (line 204)
    6. Test SolidCableOptions.assign with a hash of options sets the corresponding attributes (lines 223-229)
    7. Test SolidCableOptions.to_h compacts nil values (line 251)
    8. Test solid_cable= delegates to solid_cable.assign (line 192)
  • verify: bin/rails test test/lib/source_monitor/configuration_test.rb -n /realtime|adapter|action_cable|solid_cable/i exits 0
  • done: Lines 166-253 covered.

Task 4: Test Events callbacks and item_processors

  • name: test-events-system
  • files:
    • test/lib/source_monitor/configuration_test.rb
  • action: Add tests covering lines 438-491 (Events). Specifically:
    1. Test registering after_item_created callback with a lambda and retrieving via callbacks_for(:after_item_created) (lines 446-449)
    2. Test registering after_item_created callback with a block
    3. Test register_item_processor adds to item_processors list (lines 452-457)
    4. Test that passing non-callable to register_item_processor raises ArgumentError (line 488)
    5. Test that registering unknown event key raises ArgumentError (line 479)
    6. Test callbacks_for returns empty array for unregistered name (line 460)
    7. Test reset! clears all callbacks and item_processors (lines 467-470)
  • verify: bin/rails test test/lib/source_monitor/configuration_test.rb -n /events|callback|item_processor/i exits 0
  • done: Lines 438-491 covered.

Task 5: Test Models, ModelDefinition, ConcernDefinition, and ValidationDefinition

  • name: test-models-and-definitions
  • files:
    • test/lib/source_monitor/configuration_test.rb
  • action: Add tests covering lines 493-652 (Models, ModelDefinition, ConcernDefinition, ValidationDefinition). Specifically:
    1. Test Models.table_name_prefix default is "sourcemon_" (line 507)
    2. Test Models.for(:source) returns a ModelDefinition, and Models.for(:unknown) raises ArgumentError (lines 515-521)
    3. Test ModelDefinition.include_concern with a Module directly (line 591-592)
    4. Test ModelDefinition.include_concern with a string constant name that resolves (lines 593-598)
    5. Test ModelDefinition.include_concern with a block creates anonymous module (lines 588-590)
    6. Test ModelDefinition.include_concern deduplicates by signature (line 534)
    7. Test ModelDefinition.validate with symbol, with callable (proc), and with block (lines 549-563)
    8. Test ModelDefinition.validate with invalid handler raises ArgumentError (line 558)
    9. Test ValidationDefinition.signature for symbol, callable, and string handlers (lines 636-647)
    10. Test ValidationDefinition.symbol? (lines 649-651) Use real module references and string constants for concern resolution tests.
  • verify: bin/rails test test/lib/source_monitor/configuration_test.rb -n /models|model_definition|concern|validation_definition/i exits 0
  • done: Lines 493-652 covered.

Verification

  1. bin/rails test test/lib/source_monitor/configuration_test.rb exits 0
  2. COVERAGE=1 bin/rails test test/lib/source_monitor/configuration_test.rb shows configuration.rb with >80% branch coverage
  3. bin/rails test exits 0 (no regressions)

Success Criteria

  • Configuration coverage drops from 94 uncovered lines to fewer than 20
  • AuthenticationSettings handlers fully tested
  • ScrapingSettings and RetentionSettings edge cases tested
  • RealtimeSettings adapter validation and action_cable_config tested
  • Events callbacks and item_processors tested
  • Models and definition classes tested
  • REQ-03 substantially satisfied