Back to Source Monitor

PLAN-01 Summary: feed-fetcher-tests

.vbw-planning/milestones/03-coverage-analysis-quick-wins-critical-path-test-co/phases/02-critical-path-test-coverage/PLAN-01-SUMMARY.md

0.15.02.8 KB
Original Source

PLAN-01 Summary: feed-fetcher-tests

Status: COMPLETE

Commit

  • Hash: 8d4e8d3
  • Message: test(feed-fetcher): close coverage gaps for retry, errors, headers, entries, helpers [dev-plan01]
  • Files changed: 1 file, 734 insertions

Tasks Completed

Task 1: Test retry strategy and circuit breaker transitions

  • Added tests for reset_retry_state!, apply_retry_strategy!, circuit breaker open/close
  • Verified first timeout sets fetch_retry_attempt to 1
  • Verified exhausting retries opens circuit (sets fetch_circuit_opened_at, fetch_circuit_until)
  • Verified successful fetch resets retry state
  • Tested RetryPolicy error handling fallback

Task 2: Test Faraday error wrapping and connection failures

  • Tested Faraday::ConnectionFailed raises ConnectionError with original_error preserved
  • Tested Faraday::SSLError raises ConnectionError
  • Tested Faraday::ClientError with response hash builds HTTPError via build_http_error_from_faraday
  • Tested generic Faraday::Error raises FetchError
  • Tested non-Faraday StandardError wrapped in UnexpectedResponseError

Task 3: Test Last-Modified header handling and request headers

  • Tested If-Modified-Since header sent when source.last_modified is set
  • Tested Last-Modified response header parsed and stored on source
  • Tested malformed Last-Modified headers silently ignored
  • Tested custom_headers from source passed through to request
  • Tested ETag and Last-Modified preserved on 304 responses

Task 4: Test entry processing edge cases and error normalization

  • Tested feed without entries returns zero counts
  • Tested Events.run_item_processors called for each entry
  • Tested Events.after_item_created called only for created items
  • Tested normalize_item_error extracts guid via entry_id/id fallbacks
  • Tested safe_entry_title returns nil for entries without title

Task 5: Test jitter, interval helpers, and metadata management

  • Tested jitter_offset returns 0 when interval_seconds <= 0
  • Tested jitter_offset uses jitter_proc when provided
  • Tested body_digest returns nil for blank body, SHA256 for non-blank
  • Tested updated_metadata preserves existing metadata
  • Tested configured_seconds, extract_numeric edge cases

Deviations

None -- plan executed as specified.

Verification Results

CheckResult
bin/rails test test/lib/source_monitor/fetching/feed_fetcher_test.rbAll tests pass
bin/rails test760 runs, 2626 assertions, 0 failures, 0 errors, 0 skips

Success Criteria

  • 48 new tests added (734 lines)
  • All retry/circuit breaker branches tested
  • All Faraday error wrapping branches tested
  • All header handling branches tested
  • Entry processing and error normalization branches tested
  • Jitter, interval helpers, and metadata management tested
  • REQ-01 substantially satisfied