Back to Source Monitor

extract-feed-fetcher

.vbw-planning/milestones/03-coverage-analysis-quick-wins-critical-path-test-co/phases/03-large-file-refactoring/PLAN-01.md

0.14.010.7 KB
Original Source

Plan 01: extract-feed-fetcher

Objective

Extract lib/source_monitor/fetching/feed_fetcher.rb (627 lines) into focused sub-modules following the existing extraction pattern used by item_scraper/ (which already has adapter_resolver.rb and persistence.rb sub-modules) and completion/ (which has event_publisher.rb, follow_up_handler.rb, retention_handler.rb). The public API (FeedFetcher.new(source:).call returning a Result struct) must remain unchanged. All 1219 lines of existing tests in feed_fetcher_test.rb must continue to pass without modification.

Context

<context> @lib/source_monitor/fetching/feed_fetcher.rb -- 627 lines, the core fetch pipeline. Contains HTTP request handling, feed parsing, entry processing, source state updates (success/not_modified/failure), adaptive interval computation, retry strategy application, fetch logging, error wrapping, and various utility helpers. @lib/source_monitor/fetching/retry_policy.rb -- 85 lines, already extracted. RetryPolicy with Decision struct. @lib/source_monitor/fetching/fetch_error.rb -- 88 lines, already extracted. Error hierarchy. @lib/source_monitor/fetching/completion/ -- existing extraction pattern: event_publisher.rb (22 lines), follow_up_handler.rb (37 lines), retention_handler.rb (30 lines). These are loaded via require from fetch_runner.rb. @lib/source_monitor/scraping/item_scraper.rb -- another extraction example: main class requires item_scraper/adapter_resolver.rb and item_scraper/persistence.rb @test/lib/source_monitor/fetching/feed_fetcher_test.rb -- 1219 lines, 48+ tests covering all branches. MUST NOT be modified. @lib/source_monitor.rb -- has `require "source_monitor/fetching/feed_fetcher"` on line 79. New sub-files will be required from feed_fetcher.rb itself (matching item_scraper pattern).

Decomposition rationale: FeedFetcher has three clearly separable responsibility clusters: (1) source state updates after fetch (update_source_for_success, update_source_for_not_modified, update_source_for_failure, reset_retry_state!, apply_retry_strategy!, create_fetch_log -- ~120 lines), (2) adaptive interval computation (apply_adaptive_interval!, compute_next_interval_seconds, adjusted_interval_with_jitter, jitter_offset, and all interval config helpers -- ~110 lines), (3) entry processing (process_feed_entries, normalize_item_error, safe_entry_guid, safe_entry_title -- ~80 lines). The remaining orchestration (call, perform_fetch, handle_response, handle_success, handle_not_modified, handle_failure, HTTP helpers) stays in the main file.

Trade-offs considered:

  • Could extract HTTP/connection as a fourth module, but perform_request and connection are only ~10 lines and tightly coupled to the orchestrator.
  • Could use Ruby mixins (include/extend) instead of delegation, but delegation preserves clear ownership and matches the item_scraper pattern.
  • Structs (Result, EntryProcessingResult, ResponseWrapper) stay in the main file because they define the public API contract.

What constrains the structure:

  • The main file must require its sub-modules (matching item_scraper pattern)
  • Sub-modules need access to source, fetching_config, and other state -- pass via constructor or delegate
  • All tests pass without modification -- the public API is preserved
  • Each extracted module lives in lib/source_monitor/fetching/feed_fetcher/ directory (matching item_scraper/ pattern) </context>

Tasks

Execution note: Task 2 (AdaptiveInterval) should be completed before Task 1 (SourceUpdater) because SourceUpdater depends on AdaptiveInterval for the apply_adaptive_interval! method. Task 3 (EntryProcessor) is independent of the other two. Task 4 is the final wiring pass.

Task 1: Extract SourceUpdater module

  • name: extract-source-updater

  • files:

    • lib/source_monitor/fetching/feed_fetcher/source_updater.rb (new)
    • lib/source_monitor/fetching/feed_fetcher.rb
  • action: Create lib/source_monitor/fetching/feed_fetcher/source_updater.rb containing a SourceMonitor::Fetching::FeedFetcher::SourceUpdater class. Move these methods from feed_fetcher.rb into the new class:

    • update_source_for_success (lines 192-216)
    • update_source_for_not_modified (lines 218-241)
    • update_source_for_failure (lines 243-259)
    • reset_retry_state! (lines 261-265)
    • apply_retry_strategy! (lines 267-299)
    • create_fetch_log (lines 301-320)
    • feed_metadata (lines 328-335)
    • normalized_headers (lines 337-341)
    • error_backtrace (lines 343-347)
    • derive_feed_format (lines 322-326)
    • feed_signature_changed? (lines 419-423)
    • updated_metadata (lines 490-495)
    • parse_http_time (lines 349-355)
    • elapsed_ms (lines 357-359)

    The SourceUpdater constructor takes source: and adaptive_interval: (the AdaptiveInterval instance from Task 2). Add require "source_monitor/fetching/feed_fetcher/source_updater" at the top of feed_fetcher.rb. In FeedFetcher, create a source_updater method that lazily instantiates the SourceUpdater passing source and adaptive_interval. Replace all calls to the moved methods with delegation to source_updater.method_name. The SourceUpdater must be a private implementation detail -- not exposed in the public API.

  • verify: ruby -c lib/source_monitor/fetching/feed_fetcher/source_updater.rb exits 0 AND bin/rails test test/lib/source_monitor/fetching/feed_fetcher_test.rb exits 0 with zero failures

  • done: SourceUpdater extracted. All calls delegated. Tests pass unchanged.

Task 2: Extract AdaptiveInterval module

  • name: extract-adaptive-interval

  • files:

    • lib/source_monitor/fetching/feed_fetcher/adaptive_interval.rb (new)
    • lib/source_monitor/fetching/feed_fetcher.rb
  • action: Create lib/source_monitor/fetching/feed_fetcher/adaptive_interval.rb containing a SourceMonitor::Fetching::FeedFetcher::AdaptiveInterval class. Move these methods:

    • apply_adaptive_interval! (lines 425-438)
    • compute_next_interval_seconds (lines 441-455)
    • current_interval_seconds (lines 457-459)
    • interval_minutes_for (lines 461-464)
    • min_fetch_interval_seconds (lines 466-468)
    • max_fetch_interval_seconds (lines 470-472)
    • increase_factor_value (lines 474-476)
    • decrease_factor_value (lines 478-480)
    • failure_increase_factor_value (lines 482-484)
    • jitter_percent_value (lines 486-488)
    • adjusted_interval_with_jitter (lines 497-502)
    • jitter_offset (lines 504-512)
    • configured_seconds (lines 569-574)
    • configured_positive (lines 576-580)
    • configured_non_negative (lines 583-588)
    • extract_numeric (lines 590-597)
    • fetching_config (lines 599-601)

    Also move the constants: MIN_FETCH_INTERVAL, MAX_FETCH_INTERVAL, INCREASE_FACTOR, DECREASE_FACTOR, FAILURE_INCREASE_FACTOR, JITTER_PERCENT.

    The constructor takes source: and jitter_proc:. Add require "source_monitor/fetching/feed_fetcher/adaptive_interval" at the top of feed_fetcher.rb. In FeedFetcher, create an adaptive_interval method that lazily instantiates AdaptiveInterval. Replace all calls to moved methods with delegation. Keep the constant references working by aliasing from the main class or referencing the sub-module.

  • verify: ruby -c lib/source_monitor/fetching/feed_fetcher/adaptive_interval.rb exits 0 AND bin/rails test test/lib/source_monitor/fetching/feed_fetcher_test.rb exits 0

  • done: AdaptiveInterval extracted. Constants accessible. Tests pass unchanged.

Task 3: Extract EntryProcessor module

  • name: extract-entry-processor

  • files:

    • lib/source_monitor/fetching/feed_fetcher/entry_processor.rb (new)
    • lib/source_monitor/fetching/feed_fetcher.rb
  • action: Create lib/source_monitor/fetching/feed_fetcher/entry_processor.rb containing a SourceMonitor::Fetching::FeedFetcher::EntryProcessor class. Move these methods:

    • process_feed_entries (lines 520-567)
    • normalize_item_error (lines 603-612)
    • safe_entry_guid (lines 614-620)
    • safe_entry_title (lines 622-624)

    The constructor takes source:. It returns EntryProcessingResult structs (which stay defined in the main FeedFetcher class and are referenced as FeedFetcher::EntryProcessingResult). Add require "source_monitor/fetching/feed_fetcher/entry_processor" at the top of feed_fetcher.rb. In FeedFetcher, create an entry_processor method and delegate process_feed_entries to it. The other methods are only called from within entry_processor so they move wholesale.

  • verify: ruby -c lib/source_monitor/fetching/feed_fetcher/entry_processor.rb exits 0 AND bin/rails test test/lib/source_monitor/fetching/feed_fetcher_test.rb exits 0

  • done: EntryProcessor extracted. Tests pass unchanged.

Task 4: Wire extracted modules and verify final line count

  • name: wire-modules-and-verify
  • files:
    • lib/source_monitor/fetching/feed_fetcher.rb
  • action: After Tasks 1-3, the main feed_fetcher.rb should contain: require statements for the 3 sub-modules, the Struct definitions (Result, EntryProcessingResult, ResponseWrapper), the constructor, call, perform_fetch, handle_response, handle_success, handle_not_modified, handle_failure, perform_request, connection, request_headers, build_http_error_from_faraday, body_digest, and the lazy accessor methods for source_updater, adaptive_interval, and entry_processor. Clean up any dead code, unused private methods, or orphaned requires. Ensure no method is duplicated between the main file and sub-modules. Verify the main file is under 300 lines. Run the full test suite to confirm no regressions.
  • verify: wc -l lib/source_monitor/fetching/feed_fetcher.rb shows fewer than 300 lines AND bin/rails test exits 0 with 760+ runs and 0 failures AND bin/rubocop lib/source_monitor/fetching/feed_fetcher.rb lib/source_monitor/fetching/feed_fetcher/ exits 0
  • done: FeedFetcher under 300 lines. All sub-modules syntactically valid. Full suite passes. RuboCop clean.

Verification

  1. wc -l lib/source_monitor/fetching/feed_fetcher.rb shows fewer than 300 lines
  2. wc -l lib/source_monitor/fetching/feed_fetcher/source_updater.rb lib/source_monitor/fetching/feed_fetcher/adaptive_interval.rb lib/source_monitor/fetching/feed_fetcher/entry_processor.rb shows all exist
  3. bin/rails test test/lib/source_monitor/fetching/feed_fetcher_test.rb exits 0 with zero failures
  4. bin/rails test exits 0 (no regressions)
  5. bin/rubocop lib/source_monitor/fetching/ exits 0

Success Criteria

  • FeedFetcher main file under 300 lines
  • Three sub-modules created: source_updater.rb, adaptive_interval.rb, entry_processor.rb
  • Public API unchanged -- FeedFetcher.new(source:).call returns Result struct
  • All existing tests pass without modification (1219 lines, 48+ tests)
  • Full test suite passes (760+ runs, 0 failures)
  • RuboCop passes on all modified/new files
  • REQ-08 satisfied