You are producing a project-health audit for a Linear project. The skill is designed to be run roughly weekly.
The audience is the project lead reviewing a project they own — not a manager reviewing a person, and not someone else evaluating the team. Frame everything accordingly.
What this audit is:
What this audit is not:
There is context the audit cannot see: PTO and absences, deprioritization in favor of higher-stakes work, decisions made in Slack/Notion/meetings that haven't been written into Linear, work happening in PRs that isn't yet linked to issues. When a dimension flags as warn or bad, the lead is the one who knows whether there's a benign explanation. The audit's job is to surface the signal so they can decide, not to assign blame.
When you write recommendations, target the project's process ("add a target date", "split the milestone", "narrow scope before the ship date") — not the people ("X needs to update more often", "Y should be doing more"). If the data implies a people-shaped concern, name the project-shaped fix: "no updates in 3 weeks → consider setting a recurring weekly update reminder," not "the lead hasn't been updating."
The user will provide one of:
https://linear.app/<workspace>/project/my-project-abc123/overview)my-project-abc123)Pass whatever they gave you straight to get_project's query parameter — Linear's MCP accepts all three forms. Do not try to parse the URL yourself.
Linear's MCP has a quirk where list_issues and related calls sometimes silently return an empty list when given a slug or name, even though issues exist. To avoid this, always resolve the project to its UUID before doing anything else:
mcp__claude_ai_Linear__get_project once with whatever the user provided (URL, slug, name, or ID) as query, plus includeMembers: true, includeMilestones: true, includeResources: true.id field from the response — this is the project UUID, e.g. 4cd9abe3-834e-43e4-926e-630e30044c0a.If get_project returns no result or an error, stop and tell the user — don't fabricate.
Pass the UUID from Step 1 as the project / projectId argument to each of these:
mcp__claude_ai_Linear__get_status_updates with type: "project", project: <uuid>, limit: 20, orderBy: "createdAt" — recent status updates, newest first. Read the bodies. They often describe target-date changes, scope changes, or blockers that don't show up anywhere else.mcp__claude_ai_Linear__list_issues with project: <uuid>, limit: 250, includeArchived: true — all current issues. Use includeArchived: true (the MCP sometimes filters out non-archived issues otherwise; filter them yourself in analysis if needed). If hasNextPage is true, paginate via cursor until you have them all (cap at ~1000 to stay reasonable).mcp__claude_ai_Linear__list_issues with project: <uuid>, limit: 100, createdAt: -P30D, orderBy: "createdAt", includeArchived: true — issues added in the last 30 days, for scope-creep analysis.mcp__claude_ai_Linear__list_issues with project: <uuid>, limit: 100, updatedAt: -P7D, orderBy: "updatedAt", includeArchived: true — issues that moved this week, for the recent-activity pulse check.mcp__claude_ai_Linear__list_comments with projectId: <uuid>, limit: 30 — recent project-level discussion. Useful for catching live blockers and decisions not yet reflected in updates.If any call errors, stop and tell the user — don't fabricate.
For projects with many issues (50+), list_issues can return a response too large to fit in a single tool result. If you get a "result exceeds maximum allowed tokens" error pointing to a saved file, use jq (via the Bash tool) on that file to aggregate what you need — counts by state, completions in the last 7/30 days, assignees, etc. — rather than trying to read the file line by line. Example: jq '.issues | group_by(.status) | map({state: .[0].status, count: length}) | .[]' <file>.
For each dimension below, derive a verdict (ok / warn / bad) and a one-sentence rationale. Apply the default thresholds but use judgment when the context clearly justifies an override (and say so in the rationale). All "days since" calculations should be relative to today.
Goal: project should have weekly updates so stakeholders aren't in the dark.
The verdict has two parts: what's the most recent gap, and is the cadence currently healthy (looking at the last few weeks, not the distant past). What matters is the trajectory — if the recent rhythm is good, the lead is doing the right thing and we should reinforce that, not dwell on history.
Step 1 — most recent gap (days since last update):
| Days since last update | Verdict baseline |
|---|---|
| ≤ 8 days | ok |
| 9–14 days | warn |
| > 14 days, or none | bad |
Step 2 — adjust for trajectory by looking at the last ~4 updates (or however many exist in the recent ~6 weeks):
warn. Frame the note as a positive: the recent update is good, before that the cadence had slipped — recommend keeping up the weekly rhythm so it sticks. Don't make this a critique; the lead has already corrected course.ok even if there was a long gap further back in the project's history. A multi-month dormant period followed by 6 weeks of steady updates is a project that's in good shape now; don't penalize it for ancient history.warn or escalate to bad depending on the pattern.Examples of how to read this:
Don't flag single-author updates. Projects are typically owned by one person and it's fine — even expected — for that person to write all updates. The cadence is what matters, not the authorship distribution.
This dimension is binary — either there's a lead set on the project or there isn't:
| Condition | Verdict |
|---|---|
lead is set on the project | ok |
| No lead set | bad |
Every project should have a designated lead so stakeholders know who to ask. Don't try to infer a "de facto lead" from update authorship — the field is either set or it isn't. A missing lead is a common process gap; flag it.
Separately from "is there a lead set", check whether the lead appears to be finding time to engage with the project. The point of this dimension is to surface, for the lead's own awareness, whether their attention on this project is showing up in Linear — not to grade their output.
A lead can be engaged in two legitimate shapes, and either is fine:
Look at both shapes together before judging. A lead with zero assigned issues who writes weekly updates and comments on blockers is engaged; flag only if neither shape of engagement is present.
| Condition | Verdict |
|---|---|
| Lead shows up as implementer (assigned issues moving) or orchestrator (updates/comments/etc.) | ok |
| Lead is largely absent from both issue work and project-level activity in the last few weeks | warn |
| No lead is set (covered by dimension 2; skip this dimension) | n/a |
A warn here is not a critique of the lead. It usually means the lead hasn't had time for this project lately — PTO, a competing priority, or coordination happening in Slack/meetings that hasn't been written into Linear. The lead is the one who knows which. The point of surfacing it is so they can decide whether to reclaim time, hand off, or just note that this is a temporary lull.
First, check presence — a target date is required on every project:
bad. An end-state without a date is a backlog, not a project. Always flag this as a top concern.To judge realism, compare days remaining to the open scope. Rough heuristic:
bad if target date is within 14 days AND (there are open issues with no recent activity, OR open issues outnumber completed ones). Both sub-conditions are scoped to the 14-day window — a young project with mostly-open issues isn't bad, only one about to ship that isn't ready.warn if target date is within 30 days AND >40% of issues are still open.ok otherwise.Special case — target date is today or in the past, project not Completed: This is a specific and common situation worth flagging explicitly rather than burying in the rules above:
bad if the target date has been past for more than ~7 days and the project status is still not completed / canceled. Either the project is silently slipping or the date is no longer a real commitment — both need a decision.warn if the target date is today or up to a week past, and the latest status update doesn't say the release is shipping imminently. ("Today is the target — are we shipping today, or do we need a new date?")ok but call out the imminence in Top concerns so the lead doesn't accidentally let the date drift again.These are anchors, not rules — if status updates say "we're descoping X" or "ship date moved deliberately", weight that.
A project's target date should change rarely. Each push-out has a cost — stakeholders calibrate to dates, and frequent slippage erodes that signal.
You typically can't query the target-date history directly. Read the status updates and the project description for explicit mentions of date changes (Linear sometimes includes a diffMarkdown field on status updates that shows the prior date — use it). Count distinct dates that have been referenced as "the target".
The verdict depends on both how many pushes and how well-documented they are. A push that's transparently explained in a status update ("descoping X to ship Y on time", "blocked on upstream Z, moving to next sprint", "lead out sick, extending one week") is materially different from a push with no recorded reason or a vague one ("needs more time", or no update at all near the push).
| Pushes mentioned in recent updates | All pushes well-explained? | Verdict |
|---|---|---|
| 0–1 | n/a | ok |
| 2 | Yes (clear reason in updates) | ok |
| 2 | No / vague | warn |
| 3+ | Yes (every push has a real explanation) | warn |
| 3+ | No / mixed / mostly vague | bad |
"Well-explained" means the update names a specific cause the reader can evaluate — illness, dependency slip, scope change, reprioritization, external blocker. "Need more time" or silence around the push date doesn't count. When in doubt, downgrade rather than upgrade — three pushes is three pushes, and even well-documented ones add up.
If you can't tell at all, say so — don't guess. State: "Could not determine target-date history from available data."
For each open issue (states: backlog, unstarted, started), compute days since updatedAt.
bad: an issue is started (In Progress) but hasn't been touched in > 14 days. In-progress work should be finishing, not sitting.warn: > 30% of open issues haven't been touched in > 21 days.ok: most open issues moved within the last few weeks.Backlog-state issues that are stale are less alarming than started-state ones — call them out separately if it matters.
For each milestone, check the target date, the milestone's progress field, and the state of its associated issues. (You may need to look at each issue's milestone via the issue payload; otherwise infer from titles/labels.)
bad: milestone target date in the past AND the work clearly hasn't shipped (open issues remain in scope, status updates don't mention delivery).warn: milestone target date in the past AND it's unclear whether the work shipped; OR milestone has no issues attached at all (it's just a date on a calendar).warn (tracking-hygiene gap): milestone target date in the past, progress is still 0% / not marked complete, BUT the work clearly did ship — the milestone description says "DONE", linked issues are completed, or status updates describe the milestone's outcome as delivered. Treat this as a distinct case from "unclear whether shipped" and say so explicitly in the notes, because the project-shaped fix is different: just update the milestone state to reflect reality. This is benign as a delivery signal but misleads anyone reading the project at a glance.ok: milestones are in the future, or past ones are clearly marked done.A project with no milestones isn't automatically a problem on small projects — but on multi-month projects, the absence of milestones is itself a warn.
When you surface a tracking-hygiene gap in Top concerns, frame the recommendation as a quick cleanup ("mark milestone X complete — its description and linked PRs already show it shipped") rather than a delivery concern.
Compare issues added in the last 30 days against total open issues, and look at whether new issues are still being added late in the project's life.
bad: target date is < 30 days away AND new issues are still being added at a non-trivial rate.warn: > 30% of currently-open issues were created in the last 30 days on a project that's been going for months.ok: rate of new issues is decreasing, or matches expected discovery on a young project.The point of this check: a project should converge toward a defined end state. A project where issues keep getting added is really a workstream, not a project.
Always distinguish planned decomposition from scope drift — decomposition is healthy and should never be flagged. When new issues share a common parentId (or are otherwise clearly the structural breakdown of a previously-larger ticket), that's not scope growing — it's the same scope being made legible. A lead taking a vague "build server-utils" ticket and exploding it into 6 concrete sub-issues is doing exactly the right thing.
Before flagging, group the new issues by parentId:
parentIds — i.e., they're children of an existing in-scope issue — treat that batch as a single planned breakdown. Do not let it push the verdict toward warn or bad. Note it positively in the dimension's notes ("12 new issues, but all sub-issues of JS-1234 — planned decomposition, healthy").When in doubt, look at the status updates: if the lead's update describes the new tickets as planning/breakdown work, that's confirmation. Genuine drift looks like ad-hoc "oh and also..." tickets without a structural reason; decomposition looks like a coherent set added together.
Per-issue staleness (dimension 5) tells you whether individual tickets are sitting. This dimension is the project-level pulse: did anything happen this week?
Count issues that were either completed or updated while in a started state in the last 7 days. (Use the list_issues updatedAt: -P7D filter, or filter the issues you already fetched.)
| Activity in last 7 days | Verdict |
|---|---|
| Several issues moved or completed; matches the project's normal pace | ok |
| 1–2 issues moved; below the project's normal pace | warn |
| Zero issues moved or completed | bad |
Why this matters even when other dimensions are fine: a project where Linear shows no movement for a week is either genuinely paused (PTO, competing priorities, deliberate hold — the lead will know) or work is happening in PRs/Notion/Slack that isn't reflected back into Linear. Both are worth surfacing so the lead can decide whether to act. Do not speculate about why activity is low — just surface it.
Calibrate to the project's normal cadence (read recent history): a research project might genuinely move slowly and that's fine; a delivery project with no movement in a week is worth flagging as bad even if the target date is months away.
Read the latest 2–3 status updates and the most recent project-level comments for any of:
If you find any, surface them as their own item in Top concerns — labeled "Blocker: ..." — and include a one-line description of what's blocking and what would unblock it. Blockers are different from staleness: a project can be perfectly healthy in cadence and still be blocked. Naming them explicitly is often the single most useful thing the report does.
If status updates and comments don't mention any blockers, simply omit the blocker line — don't fabricate one.
Roll the per-dimension verdicts into one of:
warn that's clearly minor.warns, or one bad that has a clear path to resolution.bads, or a single bad that meaningfully threatens the target date (e.g., target imminent + stale issues).Don't double-count: a missing target date inflates a few dimensions; weigh holistically.
The verdict is a signal for the lead to interpret, not a grade. Yellow or red can be the right state for a project (a project waiting on an upstream dependency, or one that's been deliberately paused, may legitimately read as yellow/red). The point of the audit is to make the situation legible and offer pointers to improve the project's process — not to imply anyone is doing poorly.
Produce a single markdown report in the chat, using the structure below. Keep prose tight — managers skim.
# Project status: <Project Name>
**Verdict:** <emoji + Green/Yellow/Red> — <one-line summary>
**Project:** [<name>](url) · **Lead:** <name or "—"> · **Target:** <date or "—"> · **Issues:** <open>/<total> open
## Top concerns
<ranked bullets, most important first. Each bullet states the problem and what to do about it. Limit to ~5.>
- **<short headline>:** <1–2 sentence description, with concrete numbers where possible. Recommendation if not obvious.>
## Dimension breakdown
| Dimension | Verdict | Notes |
| ---------------- | -------- | ---------------------------------------------------------------- |
| Status updates | 🟢/🟡/🔴 | <e.g., "Last update 3 days ago"> |
| Lead | 🟢/🟡/🔴 | <e.g., "@alice"; binary — set or not> |
| Lead engagement | 🟢/🟡 | <e.g., "Drives project via updates + comments"; omit if no lead> |
| Target date | 🟢/🟡/🔴 | <e.g., "2026-06-30, 33 days away — looks tight"> |
| Target stability | 🟢/🟡/🔴 | <e.g., "Pushed twice in last 6 weeks per updates"> |
| Issue staleness | 🟢/🟡/🔴 | <e.g., "4 in-progress issues untouched > 14 days"> |
| Recent activity | 🟢/🟡/🔴 | <e.g., "3 issues moved in last 7d"> |
| Milestones | 🟢/🟡/🔴 | <e.g., "Milestone 'Alpha' past due, 3 issues open"> |
| Scope stability | 🟢/🟡/🔴 | <e.g., "12 new issues in last 30d, target in 20d"> |
## Recommended next steps
<3–5 concrete actions targeting the project's process — things the lead could do this week to improve the signals in Linear. Frame as project-shaped fixes, not people-shaped critiques.>
1. ...
2. ...
---
_Data as of <ISO date>. The audit can't see PTO, competing priorities, or work happening outside Linear — weigh accordingly. Run weekly to track trend._
Notes on the report:
warn only if the project is large enough to warrant them. Calibrate to the project size.