V3 Phase 14 S8 — P15 Handoff

sw-block/design/v3-phase-14-s8-p15-handoff.md

4.2310.4 KB
Original Source

V3 Phase 14 S8 — P15 Handoff

Date: 2026-04-20 Status: draft (S8 P15 handoff, round-2 aligned to canonical P15 plan) Purpose: map every P14-residual product gap to the canonical P15 track in v3-phase-15-product-plan.md, so P15 execution starts from the correct ownership map

1. Handoff Contract

Per v3-phase-14-s8-assignment.md §3.F: every gap that P14 does NOT close must appear here with four columns — the gap, why it is not P14, which canonical P15 track owns it, and the minimum first proof gate.

Canonical P15 track numbering (from v3-phase-15-product-plan.md §4):

  1. T1 Frontend + Data Path Contract
  2. T2 CSI / External Lifecycle Surface
  3. T3 External Control API
  4. T4 Security And Auth Posture
  5. T5 Diagnostics And Explainability
  6. T6 Operator Workflow
  7. T7 V2/V3 Coexistence And Migration
  8. T8 Deployment / Upgrade / Release Hardening
  9. Final Gate Cluster Validation Agent

S8 does NOT invent new tracks, renumber existing ones, or prescribe P15 implementation — only the acceptance gate each P15 track must pass for the handed-off gap.

2. Handoff Table

#GapWhy not P14P15 owner trackRequired first proof
1Frontend data path (attach → real read → real write → stale-primary fence at frontend boundary)P14 stops at adapter/engine projection; there is no user-data I/O path in P14, and adapter.PublishHealthy is a control-plane signal, not a data-path handshake.P15 T1 Frontend + Data PathL2: V3 frontend backend attaches to an internal volume, writes data, reads it back, triggers P14 reassignment/failover, and verifies the stale primary can no longer serve writes. Covered by T1 §5 Acceptance.
2Subprocess heartbeat ingress — the L2 subprocess smoke (TestS7Process_RealSubprocessRestartSmoke) drives mint via StaticDirective, not a real heartbeat wire. The full heartbeat → observation → controller path is L1-only in the subprocess.Real heartbeat ingress is a frontend/transport surface. P14 has no intention of adding one.P15 T1 Frontend + Data Path (observation ingress is part of the frontend/transport contract)L2: subprocess accepts heartbeats over a real transport; observation store mutates; controller sees the change; adapter advances — end-to-end in a real process.
3CSI driver lifecycle (CreateVolume / DeleteVolume / ControllerPublish / NodeStage / NodePublish / NodeUnpublish / ControllerUnpublish)P14 has no orchestrator-facing lifecycle surface; CSI sits above the P14 authority/adapter route.P15 T2 CSI / External Lifecycle SurfaceL2: CSI sidecar ↔ sparrow process, full Create → Publish → use → Unpublish → Delete cycle via real CSI gRPC against V3 authority (T2 §5 Acceptance).
4External control API (REST / gRPC verbs for list / inspect / create / delete / resize / pause / resume)P14 exposes hidden test flags on sparrow only. An external API is a net-new surface.P15 T3 External Control APIL2: OpenAPI / gRPC verbs backed by V3 authority state, exercised by an external client that does NOT construct AssignmentInfo directly.
5Security / auth posture (API authn/authz, CHAP for iSCSI, TLS/mTLS where applicable, audit trail)P14 has no external authn surface.P15 T4 Security And AuthL1+L2: CHAP positive+negative for any iSCSI target shipped; API authn positive+negative; tenant-scoped listing; audit log for mutating verbs.
6Operator diagnostics surface (health dashboard, structured readout of LastUnsupported / LastConvergenceStuck / ReloadSkips, alerts)P14 records internal evidence (per-volume maps + structured JSON pass-line in S7 subprocess smoke) but does NOT expose it to operators.P15 T5 Diagnostics And ExplainabilityL2: structured /healthz + /metrics surfacing P14 internal states; L3 cp85-metrics-verify.yaml scenario class reshaped for V3.
7Operator workflow (planned failover, graceful drain, supervised reassign, supervised rebuild)P14 rejects V2 promote/demote/HandleAssignment. Operator-initiated actions MUST route through the publisher mint path as ordinary AssignmentAsks. A new workflow surface is required.P15 T6 Operator WorkflowL2: operator-triggered reassign lands in TopologyController as an AssignmentAsk; publisher mints new epoch; adapter converges. Manual promote is explicitly reshaped from V2 semantics.
8V2 ↔ V3 migration / coexistence (online migrate a V2 volume to V3 authority; rollback; mixed V2+V3 cluster)Migration is a product-level transition requiring both T1 and T6. P14 is V3-only.P15 T7 V2/V3 Coexistence And MigrationL3 + L4: op-upgrade-rollback.yaml scenario class on a mixed cluster; explicit no-split-brain check under migration.
9Deployment / hardening (systemd / container packaging, lockfile+storedir pathing, crash policy, log rotation, store backup)sparrow is currently a test binary with hidden smoke flags; no deployment story.P15 T8 Deployment / Upgrade / Release HardeningL2: deployable package starts sparrow with the durable store correctly mounted; crash-restart cycle preserves the P14 restart truth. L4: release-hardening soak (cp84-soak-4h.yaml, cp85-soak-24h.yaml).
10Final cluster validation (end-to-end: operator creates volume → data written → primary killed → failover → operator reads data back → no loss, on real hardware)P14 covers the control plane only; full cluster validation needs T1 + T2 + T3 + T4 + T5 + T6 all landed.P15 Final Gate Cluster Validation AgentComposite L3/L4 pack: smoke-block-api + ha-restart-recovery + ha-failover + ha-io-continuity + fault-partition in one run on real hardware, with evidence artifacts in learn/test/.
11Adapter fence-watchdog quantitative timeout bound (watchdog fires at exact fence deadline + structured watchdog event for fence lineage)S7 L1 covers "Fence command reaches executor via bridge + withheld callback does not produce Healthy"; the quantitative bound is adapter-package-owned and depends on the currently-uncommitted fence-watchdog branch. S7 sketch §10.1 Path B forbids S7 from reconfiguring the fence path.P14 internal follow-up (NOT a P15 track)Single adapter-package test replacing the PARTIAL row for evidence-matrix Claim 15. Lands when the fence-watchdog branch commits. Not an S8 gate.

3. Out-Of-Scope (NOT Handed Off)

These are explicit non-goals for both P14 and current P15 bounds — not failures, not deferrals, permanent exclusions.

Non-goalReason
Multi-master / leader election / distributed authority storev3-phase-14-s8-final-bounded-close.md §3.6 and v3-phase-15-product-plan.md §2 both reject. Single-active-master is the accepted topology. Any multi-master claim would require a separate phase with a distributed-authority institution.
V2 HandleAssignment / promote / demote authority-owning semanticRejected at S2, reaffirmed S3-S8. Not ported under any P15 track. Operator promote surface in T6 is reshaped, not ported.
V2 heartbeat-as-authorityRejected at S4. Heartbeats are observation inputs only under any P14 or P15 surface.

4. Handoff Integrity Check

The table splits into two distinct row classes, each with its own integrity rule:

Rows 1-10 — P15 product-surface gaps. Each of these must satisfy all four checks as of 2026-04-20:

  1. Gap is not proven at any P14 level. Cross-reference v3-phase-14-s8-evidence-matrix.md §3 — none of rows 1-10 appear as PROVEN or PARTIAL rows of the internal matrix. These are genuinely product-surface gaps P14 never attempted.
  2. Gap is assigned to a canonical P15 track. Numbering matches v3-phase-15-product-plan.md §4.
  3. First-proof gate is concrete, not a hand-wave. Every row names a specific test layer and a specific scenario or surface shape.
  4. Gap does not silently depend on a P14 claim being wider than is actually proven. Example: P15 T1 is allowed to depend on P14 Claim 10 (restart re-anchors via VolumeBridge, PROVEN at L1) but NOT on any data-path claim — P14 makes none.

Row 11 — P14 internal follow-up (exception to rule #1). Row 11 is NOT a P15 gap; it is a targeted P14 internal completion that lands when the fence-watchdog branch commits. Its integrity rules are narrower:

  1. Row 11 MUST correspond to an existing PARTIAL or subclaim-only row of the internal matrix — the whole point of the row is to name the follow-up that closes that partial. In this case row 11 corresponds to evidence-matrix Claim 15 PARTIAL (fence quantitative timeout bound). This is the inverse of rule #1 above: row 11 is listed here precisely BECAUSE it appears as PARTIAL in the matrix.
  2. Row 11 MUST NOT be assigned to any P15 track — it is explicitly labeled "P14 internal follow-up (NOT a P15 track)" in the gap table.
  3. Row 11's first-proof gate MUST be a single-package test that closes the matrix PARTIAL row — not a multi-track composite.

Splitting the integrity check this way keeps rule #1 for P15 gaps strict (any cross-reference to PROVEN/PARTIAL in the matrix is a bug there) while making row 11's purpose explicit and auditable (every P14 internal follow-up row should have a matrix PARTIAL anchor).

5. Per-Track Dependency Summary

P15 TrackDepends on P14 claimsNotes
T1 Frontend + Data PathClaims 3, 6, 10, 14 (durable reload, controller-driven, restart re-anchor, placement/rebalance)Core product dependency.
T2 CSI / LifecycleT1 + Claims 6, 10CSI needs a working data path.
T3 External APIClaims 6, 14API translates external verbs to AssignmentAsks.
T4 SecurityT1 + T3Authn/authz sits above the surfaces T1 and T3 expose.
T5 DiagnosticsClaims 2, 8, 11, 12 (supportability / stuck / unsupported evidence)Surfaces what P14 already records internally.
T6 Operator WorkflowClaims 6, 9, 14 (controller-driven, supersede, placement)Operator actions are AssignmentAsks through the controller.
T7 MigrationT1 + T6Needs both frontend and operator surfaces.
T8 DeploymentClaim 3 (durable reload) + T1Depends on durable store shape and frontend.
Final GateAll P14 claims + all P15 tracksComposite.

6. Closure

Every product gap that S8 identifies is listed here with a canonical P15 track or explicit P14 follow-up. Track numbering matches v3-phase-15-product-plan.md. P15 execution starts from this table without needing to re-derive the ownership map.