Thread: Production roadmap synthesis Verdict: Terminal output of the loop. Maps every research finding to owner / LOC / dependency / priority. Total budget: ~3,500 LOC, ~25 person-weeks.
docs/research/sota-2026-05-22/PRODUCTION-ROADMAP.md — 6-tier roadmap from loop output to shipped product.| Tier | Timeline | LOC | Person-weeks |
|---|---|---|---|
| Tier 1 | Q3 2026 (next quarter) | ~490 | 3-4 |
| Tier 2 | Q3-Q4 2026 | ~1180 | 6-8 |
| Tier 3 | 2027 | ~1140 | 8-10 |
| Tier 4-5 | long horizon | ~700+ | 6-8 |
| Total | ~3,500 | ~25 weeks |
| # | Item | LOC | Priority |
|---|---|---|---|
| 1.1 | wifi-densepose plan-antennas CLI tool | 360 | HIGH |
| 1.2 | R12.1 pose-PABS in vital_signs cog | 80 | HIGH |
| 1.3 | cog-person-count v0.0.3 chest-centric | 50 | HIGH |
| 1.4 | ADR-029 amendment w/ ADR-113 matrix | 0 | HIGH |
Tier 1 alone delivers: 93× placement-coverage lift, 9.36× intruder-detection lift, ADR-029 closed.
ruview-fed crate (800 LOC), cog-vital-signs DP (120), bench validation (200), MCP placement tool (60).
Cross-install fed (530), PQC Phase 1 (490), real-AETHER + R3.2 (200), cog-fall-detection (200).
1.1 CLI ──┬──> 1.3 person-count v0.0.3 ──┬──> 2.1 ruview-fed ──> 2.2 DP-VS ──> 3.1 X-install ──> 3.2 PQC
1.2 R12.1─┘ │ │
└──> 3.3 real-AETHER ──> 3.4 fall │
4.x verticals
After 35 ticks of research output, this is the document that lets a team pick up and ship without re-reading the 34 research notes. Priority alignment, estimate-anchoring, critical-path visibility — all in one place.
| Threads | Tier |
|---|---|
| R5 / R6 / R6.2 family / R6.1 | Tier 1 (placement + PABS) |
| R12 / R12.1 PABS | Tier 1.2 |
| R3 / R3.1 / R3.2 / R14 / R15 | Tier 2-3 (privacy + federation) |
| R7 mincut | Tier 2 (in ruview-fed) |
| R13 NEGATIVE | rules out BP cog, no Tier line |
| R10 wildlife | Tier 4.2 |
| R11 maritime | Tier 4.3 |
| R16/R17/R18 verticals | Tier 4-5 |
Every loop thread, ADR, vertical sketch has a line in some Tier above. This is the terminal output of the loop — the last document that needs the synthesis power of a research loop to produce.
ticks/tick-35.md. No PROGRESS.md edit. Branch research/sota-production-roadmap.
~1.1h to cron stop. After 35 ticks the loop has produced:
The 00-summary.md (final tick) will follow after the 12:00 UTC / 08:00 ET cron stop.