Back to Reactive Resume

Revalidation audit: plans 07–11 and 35

docs/execution/briefs/revalidate-backend-07-11-35.md

5.3.02.1 KB
Original Source

Revalidation audit: plans 07–11 and 35

Read first:

  • /Users/amruth/orca/workspaces/reactive-resume/planning-pr-3455/plans/ORCHESTRATOR.md
  • /Users/amruth/orca/workspaces/reactive-resume/planning-pr-3455/plans/DECISIONS.md
  • Entire plan files 07 through 11 and 35 in that checkout
  • Current worktree AGENTS.md, referenced issue/domain instructions, relevant context/ADRs, and package scripts

Before reading local planning files, require its git rev-parse HEAD to equal a2557b2ad40e06e1e63eb655f286e6a78fe6bf0d. If absent or different, fetch PR #3455 and use git show a2557b2ad40e06e1e63eb655f286e6a78fe6bf0d:plans/<file> for every required file. Never read planning files from stale checkout or current main. Fetch origin/main, resolve one exact implementation-source SHA, and record it. Resolve exact plan filenames first with git ls-tree -r --name-only a2557b2ad40e06e1e63eb655f286e6a78fe6bf0d plans/; read ORCHESTRATOR, DECISIONS, and the listed files whose prefixes are 07- through 11- plus 35-.

Audit only. Do not edit source, commit, push, create PRs, mutate GitHub issues, or touch coordinator ledger. Do not spawn subagents. Use CodeGraph before grep/read when .codegraph/ exists. Fetch every assigned issue body/comments and inspect live PRs/current origin/main. Q12 and blanket-approved scoped directions are binding.

For each plan and each issue, report live state/PRs, current-code validity and anchors, reproduction or documentation evidence, coherent unit split, exact owned files, dependencies, tests/checks, blockers, and disposition. Distinguish declined AIO from documentation improvements; avoid cosmetic fix claims. For import errors, require reproduction before parser/dialog changes. Separate verified facts from uncertainty. Record exact audited commit, first failing boundary, explicit tests run/results versus skipped gates, and risks. Use ledger's shared audit-disposition mapping; do not invent status values.

Write full report to .orchestration/revalidate-backend-07-11-35.md in your worktree. Final response: report path, concise unit-ready summary, blockers, and no more than ten lines.