Back to Prisma

Project health rollup: agent-native

projects/agent-native/rollups/2026-07-04-session-close-rollup.md

7.9.0-dev.172.8 KB
Original Source

Project health rollup: agent-native

Cadence: session-bookend (unattended session close) Date: 2026-07-04 ~00:05 local (2026-07-03 22:05 UTC)

Progress

  • Slices at DoD with PRs open: 3 / 4 — S1 #29689, S2 #29690 (stacked on S1), S3 #29691. None merged (human review pending; nothing merges unattended).
  • S4: Half A delivered — prisma-engines#5836 open; Half B paused at the wasm-publish boundary (prep note in the slice verification.md; TML-2970 updated).
  • Scoreboard: 8 PASS / 0 FAIL / 1 ACCEPTED DEFERRAL (AC-3, permission-gated external filings) / 1 OUT OF SCOPE (AC-10, Half B deferred by design). Findings log empty across all 9 dispatches and 10 review rounds.
  • Project-DoD: conditions 1, 2 implemented pending merges; 3 fully implemented pending merge; 5 half-delivered (engines side); 4 (content) untouched — sibling project pending its own ceremony; 6 (telemetry live in PostHog) rides S2's merge + a dogfood run; 7 (close-out) far.

Drift signals

  • [informational] S4 will silently stall at its publish boundary without an external trigger — the operator should watch engines#5836 and re-enter Half B after the dev wasm publishes. No unattended action available.

Throughput (session totals)

  • 9 dispatches (S1: 3, S2: 3, S3: 2, S4: 1), 10 review rounds, 0 failed dispatches, 1 stop-condition round (I12, resolved by spec amendment D13), 1 session-limit stall (retried cleanly, D15). 8 commits across 4 branches in 2 repositories.

Calibration

  • Dispatch counts matched plans (3/3, 3/3, 2/2, 1+1 with D2 orchestrator-direct).
  • One retro fired and landed (drive/spec/README.md): probe external-tool behavior at spec time. The rule paid for itself twice the same day (S3's probe-first found good news cheaply; S4's probe caught the ANSI-color snapshot trap before it burned a round).
  1. Review/merge #29689 → retarget #29690 to main → merge; merge #29691 (independent).
  2. File the two external items from S1's verification.md § Operator to-do (tagging ask on prisma/skills; symlink bug on vercel-labs/skills); record URLs against AC-3.
  3. Watch engines#5836; after merge + dev wasm publish, execute Half B per the S4 verification.md prep note.
  4. Run the sibling ceremony (drive-create-project in prisma/skills) for the content suite — it gates S2's stable release and project-DoD condition 4.
  5. Read unattended-decisions.md (D1–D15) — D9 (PR-open authorization reading), D13 (--copy), and D14 (AC-3 deferral) are the ones worth a deliberate nod.