Back to Prisma

Project health rollup: prisma7-config

projects/prisma7-config/rollups/2026-08-13-opening-rollup.md

7.10.0-integration-fix-prisma-publish-token.11.3 KB
Original Source

Project health rollup: prisma7-config

Cadence: opening rollup
Date: 2026-08-13 16:10 UTC

Progress

  • Slices delivered: 0 / 1.
  • Slices in flight: None.
  • Slices not started: versioned-config-coexistence — project outcome and boundary are settled; slice spec and dispatch plan are not yet authored.
  • Direct changes: N/A — this project is composed of one slice.
  • Project-DoD coverage: All ten project-specific conditions map to versioned-config-coexistence; none are implemented or verified yet.

Drift signals

None. The project has not entered implementation, the one-slice boundary remains coherent with the spec, and no scope-shift signal is present.

Throughput

  • Dispatches/day: N/A — no dispatches started.
  • Median dispatch wallclock: N/A.
  • Median rounds-to-satisfied: N/A.

Calibration

  • Size prediction accuracy: N/A — no dispatch outcomes yet.
  • Retro-trigger frequency: 0 — expected before implementation.
  • Spike-driven re-plans: 0.
  1. versioned-config-coexistence — author its slice contract and dispatch decomposition, then enter the build loop. It is the project's only slice and has no dependency blocker.

Triggers

  • No scope-shift, retro, or project-plan amendment trigger.