Re-Plan Remaining Work

When To Run

  • after a batch changes the blocker set materially
  • after a batch changes proof ownership materially
  • after scope re-interview
  • after a restored contract owner proves the current plan under-shot or over-claimed reality

Hard Rules

  • do not let remaining work collapse to browser/input only while corpus, claim-width, or example parity work is still open
  • do not let “avoid rewrite” become a planning value
  • do not let “support packages next” survive after the user has chosen the perfect redesign as the live doctrine
  • if a kept row requires rewrite, plan the rewrite
  • if a v2 north-star row is missing, keep it visible as a blocker instead of softening it into value-add

Refresh Afterward