Currently, Jib lacks any progress feedback for layer pushes. In cases where layers take a long time to push, this lack of progress indication:
This is especially prevalent for first-time users whose first builds would need to push all the layers, including the large base image layers.
An example of the current output (as of version 0.10.0) looks like:
Containerizing application to <image>...
warning: Base image 'gcr.io/distroless/java' does not use a specific image digest - build may not be reproducible
Retrieving registry credentials for gcr.io...
Getting base image gcr.io/distroless/java...
Building dependencies layer...
Building resources layer...
Building classes layer...
Container entrypoint set to [java, -cp, /app/resources:/app/classes:/app/libs/*, <main class>]
Finalizing...
Built and pushed image as <image>
Note that the build would pause on Finalizing... until all layers are finished pushing.
To display fine-grained progress feedback during the build, but not clutter the log messages.
Since Jib builds/pulls and pushes each layer independently, synchronized progress feedback (completion over all layers, such as a progress bar) could potentially limit the concurrency of the build process - but this might be negligible.
The available information for each layer include:
The non-available information for each layer include:
Therefore, the actions we can perform for progress feedback include:
And the actions we cannot perform include:
Display an overall progress bar along with the tasks currently being executed.
[===================== ] 60% complete
> Pushing classes layer
> Pulling base image layer 50501d3b88f7
> Pushing dependencies layer
> Pushing base image layer 8b106a18283f
The currently executing tasks are displayed below the overall progress bar.
Note that this would replace the logs messages that are currently outputted as those may corrupt the progress bar display.
The implementation consists of two parts:
There are a few issues to address for the progress event design:
These issues can be resolved with a decentralized allocation tree.
Each node in the DAT is immutable and initialized with a count of allocation units. These allocation units are to be claimed by progress made on that node or child nodes. Each child node claims 1 allocation unit of the parent node, meaning that completion of all allocation units on that child node means completion of 1 allocation unit on the parent node.
Consider a root node (Node A) with 10 allocation units. A child node (Node B) is added with 4 allocation units. Each of these allocation units represents 10% x 25% = 2.5% of the entire DAT progress. Completion of all the 4 child node allocation units means that the root node completed 1 allocation unit, or 10%.
New allocations can be added on-the-fly in a decentralized manner. Let's say a new download started for 123000 bytes and that download should be represented by one of the allocation units of Node B. We would create a new node (Node C) with 123000 allocation units and have its parent be Node B. This establishes the 123000 bytes that would represent 2.5% of the overall progress without needing to modify other nodes or synchronize with other tasks that may add their own sub-allocations. This also limits the creation of suballocations to only children tasks of the task that created that allocation, making it fully-compatible with a DAG task pipeline.
The DAT approach solves all of the issues present:
The downside is that the overall progress is not linear in scale among the work of each allocation. For example, an allocation representing a download may have each byte represent 1% of the total progress while another may have each byte represent 2%.
Progress events will be emitted with
Therefore, the progress monitor receiving the progress events will only need to keep a single total progress amount as its state. Upon receiving a progress event, the progress monitor updates its total progress amount by:
totalProgressAmount += progressUnits / progressTotal * allocationFraction;
progressUnits - the progress units from the progress event
progressTotal - the number of allocation units for the allocation node associated with the progress event
allocationFraction - the fraction of the total progress represented by the allocation node, calculated as the inverted product of all the parent allocation units
The progress monitor can display a progress bar to the console based on the totalProgressAmount upon each update. Using \r could work, but results in the console cursor overlapping with the progress bar line. The proposal is to, for each update, move the cursor up a line (\033[1A) and print the progress bar line with a newline at the end.
The progress monitor can also keep track of which allocation nodes have completed to display the currently executing tasks.
For Gradle, in order to keep the log messages in sync with Gradle's own log messages (such as the Gradle progress bar), the progress bar display should effectively become a "footer" to the normal log messages Jib outputs and be displayed via the same Gradle Logger interface as the rest of the log messages.
This alternative proposal was rejected because it cluttered the log messages too much.
Display percentage completion of layer pushes at 10s intervals with a 20s cliff.
...
Getting base image gcr.io/distroless/java…
Building dependencies layer…
Building resources layer...
Building classes layer...
Pushing base image layer d4c593cddccd: 30%
Pushing dependencies layer: 30%
Pushing base image layer 8b106a18283f: 10%
Pushing resources layer: 100%
Pushing classes layer: 100%
Pushing base image layer 8b106a18283f: 45%
Pushing base image layer 50501d3b88f7: 60%
Pushing base image layer d4c593cddccd: 100%
Pushing dependencies layer: 65%
Pushing base image layer 50501d3b88f7: 100%
Pushing dependencies layer: 90%
Pushing base image layer 8b106a18283f: 70%
Pushing dependencies layer: 100%
Pushing base image layer 8b106a18283f: 90%
Pushing base image layer 8b106a18283f: 100%
Container entrypoint set to [java, -cp, /app/resources:/app/classes:/app/libs/*, <main class>]
Finalizing...
Built and pushed image as <image>
Note that 100% will always be displayed to indicate completion of each layer.