plans/prompts/wave_7/pr_c3_chat_wave.md
The main-authority cutover is published from c3-chat-main-authority. Its
required trailing Phase D deletion is implemented in
c3-chat-delete-adapters and is pending review/landing. C3 is not marked
complete until both land.
Implement C3 of plans/cleanup-state-machines.md. HARD GATES — verify all three before starting: (1) plans/g1-chat-stream-study.md accepted with a GO for the host move (if the study said no-go, this prompt is void — the plan's C3 section says what happens instead); (2) C1 accepted (remote hydration + multi-window dispatch proven); (3) A6b landed (or the study folded A6b's items into this wave — check the plan status).
The study is the design of record; this prompt only carries the plan's invariants:
Deletion budget from the study is binding. Acceptance: the study's migration sequence scenarios plus same-chat-two-windows, close-initiating-window-mid-stream (continues per decision 2), reload during active stream, notification targeting, queue edit from a second window. Full streaming E2E suite + packaged two-window Electron tests. Security review for the remote definition (B3 checklist). This is the highest-blast-radius wave in the entire plan: /deep-review on every PR, and land in the smallest reviewable steps the study's sequence allows.
Branch prefix c3-chat-*; update plan status + matrix rows as reality diverges; the study document gets a postmortem section noting where implementation contradicted the design.
Trailing deletion (part of this wave, per the plan's rolling Phase D): land the wave's adapter/channel deletion as a SEPARATE PR immediately behind the cutover (same day is fine — no bake, no soak; per the plan's recorded corrections: no update window, no runtime toggle, stragglers are compile-time-detectable, and dead-code deletion cannot regress runtime once typecheck/CI pass). The separation exists ONLY to keep the high-scrutiny cutover diff pure for review; a later cutover revert simply reverts both PRs. The wave is not complete until it lands.
Rebatch note (see DEPENDENCIES.md): C3 does NOT wait for C2 — design and implementation prep start once C1 is accepted (and G1 is marked accepted), parallel with C2 waves; only the C3 cutover staggers through the single cutover slot.