plans/prompts/wave_4/pr_b4_remote_client.md
Implement B4 of plans/cleanup-state-machines.md ("Phase B — B4"). The plan wins; detailed design in plans/distrbuted-machines.md ("Remote snapshot store and React API"). Prereq: B3 merged.
Scope (still against the fake transport + test-only IPC machine; no production consumer):
Verify: typecheck, full tests, lint, golden suite green. /deep-review. Branch cleanup-b4-remote-client; /pr-push; update plan status. After this PR, Phase B is complete: transport proven, zero product change shipped — C1 is unblocked.