Implement the [Phase B] items of the "Single-window assumptions audit" in plans/cleanup-state-machines.md that reroute EXISTING production paths through B1 infrastructure. The plan wins over this prompt. Prereqs: B1 landed, golden suite landed (it is the regression gate for every item here). Can run in parallel with B2–B4 (different surfaces).
Scope — one commit per item, each running the golden suite:
Constraints: no behavior change beyond delivery mechanics — golden suite diffs are the definition of regression; any intentional delta is enumerated. Presentation-router conversion of toasts/notifications is NOT in scope (it lands with C waves per flow, under the N=1 identity rule).
Verify: typecheck, full tests, lint, golden suite green per commit, two-window harness scenarios. /deep-review. Branch cleanup-audit-rewiring; /pr-push; update the audit checklist items in the plan with this PR number.