Summary

This RFC proposes to optimize the draining process to be more legible for customers, and introduce a new step, connection_wait, to the draining process, which allows the server to early exit when all SQL connections are closed.

Motivation

Customers encountered intermittent blips and failed requests when they were performing operations that are related to restarting nodes, such as rolling updates. This is because CockroachDB’s current draining mode is incompatible with how many 3rd connection pools work against PostgreSQL. This issue is prominent for customers relying on Cockroach Cloud, which does minor upgrades with 7 days between CockroachDB releases. Customers are also looking for less downtime when going through these upgrades.

Specifically, to close a server, in PostgreSQL’s case, customers are given the option to use the “Smart Shutdown” mode, in which the server disallows new connections and waits until all sessions are closed by clients to shut down. While in CockroachDB’s case, the draining process consists of two consecutive periods, drain_wait and query_wait. Their duration is configured via two cluster settings,server.shutdown.initial_wait and server.shutdown.transactions.timeout, with the former “controlling the amount of time a server waits in an unready state before proceeding with the rest of the shutdown process”, and the latter specifying “the amount of time a server waits for current txns to finish”. CockroachDB expects all SQL connections to be closed by clients before the end of drain_wait. After drain_wait ends and query_wait starts, the server shuts down all SQL connections that are not with inflight queries (such as open transaction sessions). After the end of query_wait, all SQL connections will be forced to shut down, regardless of active SQL queries.

As part of CockroachDB’s draining process, the clients are not notified of the server’s current state (i.e. which step in the draining algorithm it is undergoing) and when their SQL connections are going to be closed. That is to say, if they are in the middle of using a connection when the server is shutting down, they may receive confusing error messages such as io timeout or ERROR: server is shutting down. More specific use cases will be discussed in the Background section.

The following shows the timeline for the current draining process of CRDB, and the workaround setting for drain_wait.

The current workaround that CockroachDB provides is to set the cluster setting server.shutdown.initial_wait longer than the sum of the maximum lifetime of a connection in the connection pool (MaxLifeTime), the time for the load balancer to stop routing new SQL connections, and the max transaction latency. This setting will let connections reach MaxLifeTime and be recycled by the connection pool before the node is being shut down (drained). Active SQL connections will stay alive until the inflight query completes. The connection pool would then recycle the connection and open a new connection, from a different node.

The downsides of this workaround are:

  1. The setting server.shutdown.initial_wait has to be adjusted based on clients’ configuration of the connection pooling and load balancer.
  2. The server is doing a hard wait till the end of server.shutdown.initial_wait. So though setting a long drain_wait can help ensure all SQL connections are closed before the (true) draining starts, it brings a long downtime for this node.

To solve these issues, this design proposes to optimize the waiting stages during the draining process, and implement an early exit when all SQL connections are closed by the client.

Note that our ultimate goal is to provide clear guidance to avoid having similar problems again, but since they are encountered by a small number of customers, we don’t want to change the default draining workflow too much, and bring the risk of a longer draining process. Instead, we're aiming at giving the user more configuration options.

Background

This section will focus on CockroachDB’s current draining process. Here are some facts about the current draining process:

  1. From the start of drain_wait, the health checkpoint /health?ready=1 returns

    shell
    {
    "error": "node is shutting down",
    "code": 14,
    "message": "node is shutting down",
    "details": [
    ]
    }%
    

    but new SQL connections are always allowed to be established during the whole span of drain_wait. This is to give a grace period for the load balancer to detect that this node has started draining, and then stop routing new SQL connections to this node.

    But if during drain_wait, the user tries to connect to this node without a load balancer, they still can. (And this means the s.sqlServer.acceptingClients.Set(false) function call before drain_wait is confusing. We propose to rename this function to s.sqlServer.isHealthcheckReady.)

  2. New SQL connections and queries are not allowed from the start of query_wait.

  3. The draining process is reported periodically in cockroach-data/logs/cockroach.log, but it does not shows the draining phases (e.g. query_wait).

  4. If all SQL connections are idle or there are no SQL connections during drain_wait, the server still does a hard wait till the end of drain_wait.

  5. If all SQL connections become query-free at a timestamp within query_wait, the server performs an early exit.

  6. If a user acquires a connection before query_wait starts, but sends the server a query on this connection after query_wait starts, this user will receive ERROR: server is shutting down.

  7. Throughout the whole draining process, HTTP connections are still allowed. The restrictions are only for SQL connection.

In summary, the features of the two periods in the current draining process, drain_wait and query_wait, are as below: To better illustrate the behavior of the current draining process, and the problem it brings along, we made an experiment with the HirakiCP connection pool is built here, and a demo recording can be found here.

Technical Design

This design proposes to optimize the draining process by adding a new waiting period between drain_wait and query_wait called connection_wait, during which the server waits for clients to close SQL connections. New SQL connections are not allowed, and any SQL connections that are not pulled by the user and expire the MaxLifeTime will be closed by the connection pool. i.e. no more client queries will be allowed to this draining node within this period, and the connection pools are expected to recycle idle SQL connections.

If at a certain timestamp all SQL connections are closed, the server performs an early exit and proceeds to the lease transfer stage. Note that if a connection is pulled by a user and waiting for query input, this connection is not considered idle, and will not be recycled until the user puts it back in the pool. The timeout is finite. Clients can notice from the log that the existing SQL connections that are not executing queries will be closed. The following is the proposed draining process with optimized waiting stages, and early exit.

Most of the changes should be made in the server and pgwire package. Similar to existent drain_wait and query_wait, the new wait period will be declared as a *settings.DurationSetting as follows:

go
connectionWait = settings.RegisterDurationSetting(
    settings.SystemVisible,
    "server.shutdown.connection_wait",
    "the amount of time a server waits for clients to close existing SQL
    connections. After the start of connection_wait, no new SQL connections are
    allowed. If all SQL connections are closed by the client, the server will
    continue with the rest of the shutdown process before the end of
    connection_wait.”,
    0*time.Second,
    settings.WithName("server.shutdown.connections.timeout"),
).WithPublic()

The default duration length of connection_wait is set to be 0 seconds. This is because the draining error mentioned above only happened to a small number of users, and we don’t want this workaround to implicitly prolong the existing draining process for all customers. We leave the users or operators to better configure the duration of connection_wait if they hit an error during draining.

The main functionalities of connection_wait will be implemented with a function func (s *Server) DrainConnections(ctx context.Context, connectionWait time.Duration) at /pkg/sql/pgwire/server.go.

It mainly consists of three parts:

  • Disallow new SQL connections: we move the calling of func (s *Server) setDrainingLocked from func (s *Server) drainImpl, which is used during query_wait, to the connection_wait. setDrainingLocked modifies the server attribute s.mu.draining, which is checked when the server registers a new connection at func (s *Server) ServeConn in pkg/sql/pgwire/server.go.
  • Early exit if all SQL connections are closed: we let the server keep listening to the registered SQL connections (s.mu.connCancelMap). If the length of this list reaches 0, the function returns.
  • Optimize the Reporting Systems: To provide better observability for an operator in case the draining takes a longer-than-normal time, we propose to enhance three reporting systems:
    • cockroach-data/logs/cockroach.log:
      • At the start of each draining phase, print the current timestamp, draining phase name and its duration. E.g. I220117 05:27:26.716731 connection_wait starts, no new SQL connections are allowed from now, connections will all be closed within 1m20s.
      • From the start of the whole draining process, print the number of alive SQL connections and in-flight SQL queries. This will also help customers reconfigure the length of each draining phase once they receive a related error message.
    • stdout/stderr: This is for customers / operators that drain a node interactively (e.g. through pressing ctrl-c to interrupt a cockroach start process in the cli). At the start of each draining phase, the server print the current timestamp, draining phase name and its duration in the stdout/stderr.
    • cockroach node status: When this command is called during a draining process, the output shows a draining_status field that contains the current draining phase and its duration setting, along with the number of currently active SQL connections and queries. This is for the case where the operator doesn't have access to the logs, but they want to query the draining progress through network. Note that both the HTTP API and RPC API for cockroach node status will be modified.

For an infinite connection_wait, there are concerns that "it may introduce an upgrade failure mode where SQL connections aren't closed by the customer, eventually leading the upgrade to fail (as we need some timeout); this will frustrate the customer and maybe, even more, it will frustrate CRL eng including SRE who own patching fleet (instead of the customer)." Therefore, we propose to pause allowing an infinite connection_wait until we confirm that customers have to apply this feature.

In summary, the desired final state of this design is to have the following timeline for the draining:

  • drain_wait (unchanged): health?ready=1 starts to return the draining state of the node, and load balancer listening to this http for health check stops routing new SQL connections to this draining node. But new SQL connections from other channels are still allowed, and existing SQL connections still work.
  • connection_wait: No new SQL connections are allowed. Existing SQL connections still work, but those without queries in-flight will be given a timeout to be recycled by connection pool or closed by user. Idle SQL connections whose lifetime is longer than the connection pool’s maximum lifetime will be recycled. SQL connections not returned to the pool won’t be recycled. If all SQL connections are closed, it does an early exit before the timeout, and proceed to the lease transfer stage.
  • query_wait (unchanged): Any SQL connections without open queries in-flight will be closed. Any SQL connection, once its query is finished, will be closed. If all SQL connections are closed, the server does an early exit before the timeout, and proceed to the lease transfer stage. Otherwise, the server waits till query_wait times out, and then force into the the lease transfer phase. In this case, all on-going queries will be left uncommitted.
  • lease transfer stage (unchanged): The server keeps retrying until all range leases and raft leaderships on this draining node have been tranfered. In each iteration, the kvserver transfers the leases with timeout specified by server.shutdown.lease_transfer_iteration.timeout. (Which means the total duration of the lease transfer stage is not totally determined by the value of server.shutdown.lease_transfer_iteration.timeout". We propose to rename this cluster setting with server.shutdown.lease_transfer_iteration.timeout", and document it seperately with the other three waiting periods.)

Demo with changes from Technical Design

A 4-min demo recording with the same Hikari connection pool setting can be found here, where we did manual testing.

To add an automated test, we will refer to pkg/sql/conn_executor_test.go and pkg/sql/pgwire/pgwire_test.go to set up a connection pool, and apply a timeline similar to the one in the demo.

Note that in the demo we only manually tested with a single-node server. A multi-node server with a load balancer involved should also be considered. The drain_wait should still be set longer than the time that the load balance needs to stop routing new SQL connections for this draining node, and users just need to set the length of connection_wait longer than the maximum lifetime of the connection pool.

Specifically, drain_wait should be longer than the check inter in the http health check of HAProxy, and the periodSeconds in k8s’s readinessProbe setting.

Possible Stretch

We may also want to enable the server to only allow new SQL connections of certain types during drain_wait, or even allow admins to login during connection_wait. This is because some customers mentioned that they’d like to reserve access to the node when the draining process started. The possible solution is to add a gate in the connection register that looks at a connection’s metadata (e.g. if it’s from admin or not) during drain_wait and connection_wait.

Survey: configuration for C-Pool and Load Balancer

We made a survey (note: this is an internal doc) to collect information about uses’ setting for connection pool and load balancer. This would help us provide better guidance if a user encounters similar issues during draining.

Edge Cases

  • We leave the user to set the exact duration of each wait period because they should be configured based on their load balancer, connection pooling, and inflight query settings. Users are expected to be clear about how to customize the process based on their needs. If wrongly configured, the draining process can lead to existing issues, such as unexpected disconnection or uncommitted queries.

Questions not fully answered

  • How does this work in a multi-tenant deployment?
    • Issue 74412 is about supporting the drain protocol in a multi-tenant server started with mt-start-sql, with which this design will be compatible with the multi-tenant scenario. The draining process with multi-tenancy should not differ much from servers started via start or start-single-node, since in the multi-tenant architecture, each tenant has independent SQL layer.
  • How does the change behave in mixed-version deployments? During a version upgrade? Which migrations are needed?
    • If certain nodes in the cluster are not updated to support this feature, it may lead to confusion. We may need a version gate for server.shutdown.connections.timeout.
  • Is the result/usage of this change different for CC end-users than for on-prem deployments? How?
    • The new functionality in this design is expected to be used in multitenent SQL proxy.
  • Does the change impact performance? How?
    • It will likely increase the draining process’s duration since we now wait for the users to close SQL connections. But given an early exit functionality, the wait can be less painful.
  • How is resource usage affected for “large” loads?
    • Users are very more likely to wait for a long time since the server needs to wait for all SQL connections to be stopped or returned to the pool after queries are finished. A possible workaround is to set a smaller connection pool size, and also avoid running long queries.
  • Can the new functionality be disabled? Can a user opt out? How?
    • Set connection_wait to 0 seconds, then it should be identical to the current draining process. But users will still see the newly added logs and will have access to the newly added endpoints for the draining status.
  • Can the new functionality affect clusters which are not explicitly using it?
    • It can prolong the draining process by a default timeout set to the connection_wait.
  • Does the change concern authentication or authorization logic? If so, mention this explicitly tag the relevant security-minded reviewer as reviewer to the RFC.
    • So far no, since we are following the logic of existing drain_wait and query_wait.
  • Does the change create a new way to communicate data over the network? What rules are in place to ensure that this cannot be used by a malicious user to extract confidential data?
    • No, it does not create a new communication way.
  • Is there telemetry or crash reporting? What mechanisms are used to ensure no sensitive data is accidentally exposed?
    • Don’t think it is very related.
  • Is the change visible to users of CockroachDB or operators who run CockroachDB clusters?
    • Yes, they will notice it from the changes of the reporting system.
  • Is usage of the new feature observable in telemetry? If so, mention where in the code telemetry counters or metrics would be added.
    • No, it won’t affect telemetry.
  • How to accomodate the use case of changefeed?
    • Per Issue 73274, in the case of changefeed, when the traffic is down to zero (i.e. no ongoing queries), the CDC jobs still needs the server to be alive for a specific period, until it finally signals that it’s “done” and it’s safe to suspend. Such “signal” mechanism is not implemented yet in CDC, but once it’s finished we need to leverage it for the design of query_wait.

Docs changes

Since we expect the user to approriately set the length of these three waiting period during the draining process, sufficient tutorial is needed in the documentations.

Specifically, we should add the following in Cluster Settings Page:

  • The CockroachDB server's draining procedures. i.e. the behavior of the system during each waiting period. We can refer to the final state of this design in this RFC.

  • How to correctly tune the cluster settings

    • server.shutdown.initial_wait (the wait for the load balancer to detect the draining status of the node) should be in coordination with the load balancer's settings, such as the health check interval.
    • server.shutdown.connections.timeout (the timeout to wait for all SQL connections to be closed) should be longer than the maximum life time of a connection as specified in the connection pool.
    • server.shutdown.transactions.timeout (the timeout to wait all SQL txns to finish) should be greater than any of the followings:
      • The longest possible transaction in the workload expected to complete successfully under normal operating conditions.
      • The sql.defaults.idle_in_transaction_session_timeout cluster setting.
      • The sql.defaults.statement_timeout cluster setting.

    Note that the cluster setting server.shutdown.initial_wait is of different meaning of the --drain-wait flag under the cockroach node drain command. The latter specifies the "amount of time to wait for the node to drain before returning to the client", and it is usually set with several minutes. While the former only determines the duration of a subprocess, and it is usally set with couple seconds.

Drawbacks

  • Customer will still receive error messages if their connection pool configuration is not compatible with their wait period settings, e.g. connection pool’s maximum lifetime > connection_wait.

Rationale and Alternative

The design of a connection_wait that allows early exit provides the most similar functionality as Postgres’s smart shutdown service.

Note that in the current design, we only support a finite connection_wait duration, which means that in some cases, setting a long (drain_wait + connection_wait) can be the same as setting a long drain_wait without the implementation of connection_wait, and it may not solve all the existing issues.

For example, if we set drain_wait to 30s, connection_wait to 30s, and the customer grabs a SQL connection at the 20s from the start of draining, but inputs the query until 70s. Then the customer will still receive the “server is shutting down” error. In this case, the situation is not fundamentally changed, but we hope that with the improved reporting system, clients or operators will be clearer about the status of the draining process, and take corresponding actions (in the above example, abort remaining SQL connections before the connection_wait timeout). And also the early exit in connection_wait can help shorten the downtime if the user sets a long duration.

Explain it to folk outside of your team

See the motivation part.

Unsolved Questions

See “questions not fully answered” in the Technical Design section.